{"dataset":"NNN Reactor Project Tracker — change feed","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"docs":"https://www.nuclearnewsnetwork.com/tracker","since":null,"count":145,"changes":[{"date":"2026-09-08","slug":"shin-hanul-3","name":"Shin Hanul-3","country":"KR","event":"Correction: current COD estimate revised back to 2032 after KHNP-target confirmation via WNN (2025-05-20) and NEI (2026); was 2033.","source":"https://www.world-nuclear-news.org/articles/construction-of-new-korean-reactor-begins","status":"under_construction"},{"date":"2026-08-26","slug":"sizewell-c-1","name":"Sizewell C-1","country":"GB","event":"Sizewell C ends commercial talks with Galliford Try for the Link Road and Two Village Bypass; project says no schedule impact, but local press flags delay risk to the £38bn build","source":"https://www.the-independent.com/news/uk/home-news/sizewell-c-nuclear-project-roads-delay-b3039712.html","status":"under_construction"},{"date":"2026-08-05","slug":"mochovce-4","name":"Mochovce-4","country":"SK","event":"First criticality reported (NucNet, published 2026-08-07 with 2026-08-05 dateline); single trade-press source so far - awaiting Slovenske elektrarne / IAEA PRIS confirmation","source":"https://www.nucnet.org/news/slovakia-s-mochovce-4-nuclear-power-plant-reaches-first-criticality-8-5-2026","status":"commissioning"},{"date":"2026-08-03","slug":"tianwan-7","name":"Tianwan-7","country":"CN","event":"First fuel loading completed; criticality and grid connection to follow","source":"https://www.nucnet.org/news/china-completes-first-fuel-loading-at-tianwan-7-nuclear-plant-8-3-2026","status":"under_construction"},{"date":"2026-08-03","slug":"angra-3","name":"Angra-3","country":"BR","event":"Decision on Angra 3 deferred — expected to fall to Brazil's next president, who takes office in 2027","source":"https://valorinternational.globo.com/business/news/2026/08/03/decision-on-angra-3-project-will-fall-to-brazils-next-president.ghtml","status":"suspended"},{"date":"2026-08-01","slug":"changjiang-3","name":"Changjiang-3","country":"CN","event":"Grid connection and first electricity supply reported","source":"https://www.nucnet.org/news/china-s-changjiang-3-nuclear-power-plant-connected-to-grid-8-1-2026","status":"grid_connected"},{"date":"2026-07-28","slug":"shin-hanul-3","name":"Shin Hanul-3","country":"KR","event":"Correction: current COD estimate revised to 2033 after review against PRIS and the latest WNA reactor table (was 2032).","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-07-28","slug":"hinkley-point-c-2","name":"Hinkley Point C-2","country":"GB","event":"Correction: current COD estimate revised to 2031 after review against PRIS and the latest WNA reactor table (was 2030).","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-07-20","slug":"mochovce-4","name":"Mochovce-4","country":"SK","event":"Reactor assembly and sealing completed; unit entered physical start-up tests preceding first criticality (Slovenske elektrarne via WNN)","source":"https://www.world-nuclear-news.org/articles/mochovce-4-reactor-assembly-completed","status":"commissioning"},{"date":"2026-07-09","slug":"el-dabaa-4","name":"El Dabaa-4","country":"EG","event":"Rosatom reported its manufacturing division had begun producing the reactor pressure vessel for El Dabaa unit 4 at Atommash, announced alongside the unit 2 RPV installation ceremony; site targets first fuel in H1 2027 and grid connection of the plant's units from 2028","source":"https://rosatomnewsletter.com/2026/08/31/%D0%BD%D0%BE%D0%B2%D0%BE%D1%81%D1%82%D0%B8-%D0%B0%D1%8D%D1%81-%D1%8D%D0%BB%D1%8C-%D0%B4%D0%B0%D0%B1%D0%B0%D0%B0/","status":"under_construction"},{"date":"2026-07-04","slug":"taipingling-2","name":"Taipingling-2","country":"CN","event":"First grid connection reported","source":"https://world-nuclear.org/nuclear-reactor-database/details/taipingling-2","status":"grid_connected"},{"date":"2026-07-01","slug":"darlington-bwrx-300-1","name":"Darlington New Nuclear — BWRX-300 Unit 1","country":"CA","event":"Unit 1 reactor building shaft excavation past 80%; reactor pressure vessel in manufacturing","source":"https://www.renewcanada.net/the-projects/darlington-new-nuclear-project/","status":"under_construction"},{"date":"2026-06-29","slug":"mochovce-4","name":"Mochovce-4","country":"SK","event":"First fuel assembly loaded into the reactor at 15:45 local time, beginning fuel load (operator announcement via WNN, 2026-06-30)","source":"https://www.world-nuclear-news.org/articles/fuel-loading-begins-at-slovakias-mochovce-4","status":"commissioning"},{"date":"2026-06-24","slug":"darlington-bwrx-300-1","name":"Darlington New Nuclear — BWRX-300 Unit 1","country":"CA","event":"OPG applied to CNSC for 20-year operating licence — would be first operating SMR in a G7 country","source":"https://www.world-nuclear-news.org/","status":"under_construction"},{"date":"2026-06-20","slug":"rooppur-1","name":"Rooppur-1","country":"BD","event":"Grid connection expected end of August 2026 at ~300 MW initial output (minister statement)","source":"https://www.tbsnews.net/bangladesh/energy/rooppur-nuclear-plant-supply-300mw-national-grid-end-august-minister-tells","status":"commissioning"},{"date":"2026-06-19","slug":"leningrad-ii-4","name":"Leningrad II-4","country":"RU","event":"Concrete pouring began for reactor shaft","source":"https://www.world-nuclear-news.org/articles/concrete-poured-for-reactor-shaft-at-leningrads-eighth-unit","status":"under_construction"},{"date":"2026-06-16","slug":"zhaoyuan-1","name":"Zhaoyuan-1","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"zhangzhou-4","name":"Zhangzhou-4","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"zhangzhou-3","name":"Zhangzhou-3","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"xuwei-1","name":"Xuwei-1","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2031","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"xudabao-4","name":"Xudabao-4","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"xudabao-3","name":"Xudabao-3","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"xudabao-2","name":"Xudabao-2","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"xudabao-1","name":"Xudabao-1","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"xiapu-2","name":"Xiapu-2 (CFR-600)","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"xiapu-1","name":"Xiapu-1 (CFR-600)","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"tianwan-8","name":"Tianwan-8","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"tianwan-7","name":"Tianwan-7","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"taipingling-4","name":"Taipingling-4","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2031","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"taipingling-3","name":"Taipingling-3","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"taipingling-2","name":"Taipingling-2","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"grid_connected"},{"date":"2026-06-16","slug":"shin-hanul-4","name":"Shin Hanul-4","country":"KR","event":"Listed as under construction in the WNA world table, grid connection estimated 2033","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"shin-hanul-3","name":"Shin Hanul-3","country":"KR","event":"Listed as under construction in the WNA world table, grid connection estimated 2032","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"shimane-3","name":"Shimane-3","country":"JP","event":"Listed as under construction in the WNA world table","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"suspended"},{"date":"2026-06-16","slug":"shidaowan-guohe-2","name":"Shidaowan CAP1400-2 (Guohe One)","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"shidaowan-huaneng-2","name":"Shidaowan (Huaneng)-2","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"shidaowan-huaneng-1","name":"Shidaowan (Huaneng)-1","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"sanmen-4","name":"Sanmen-4","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"sanmen-3","name":"Sanmen-3","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"sanao-3","name":"San'ao-3 (Cangnan)","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"sanao-2","name":"San'ao-2 (Cangnan)","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"saeul-4","name":"Saeul-4 (ex Shin-Kori 6)","country":"KR","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"saeul-3","name":"Saeul-3 (ex Shin-Kori 5)","country":"KR","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"rooppur-2","name":"Rooppur-2","country":"BD","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"rajasthan-8","name":"Rajasthan-8 (RAPP-8)","country":"IN","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"paks-ii-1","name":"Paks II-1","country":"HU","event":"Listed as under construction in the WNA world table, grid connection estimated 2032","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"ohma-1","name":"Ohma-1","country":"JP","event":"Listed as under construction in the WNA world table","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"suspended"},{"date":"2026-06-16","slug":"ningde-6","name":"Ningde-6","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"ningde-5","name":"Ningde-5","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"mochovce-4","name":"Mochovce-4","country":"SK","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"commissioning"},{"date":"2026-06-16","slug":"lufeng-6","name":"Lufeng-6","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"lufeng-5","name":"Lufeng-5","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"lufeng-2","name":"Lufeng-2","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2031","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"lufeng-1","name":"Lufeng-1","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"lianjiang-2","name":"Lianjiang-2","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"lianjiang-1","name":"Lianjiang-1","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"leningrad-ii-4","name":"Leningrad II-4","country":"RU","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"leningrad-ii-3","name":"Leningrad II-3","country":"RU","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"kursk-ii-3","name":"Kursk II-3","country":"RU","event":"Listed as under construction in the WNA world table, grid connection estimated 2032","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"kursk-ii-2","name":"Kursk II-2","country":"RU","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"kudankulam-6","name":"Kudankulam-6","country":"IN","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"kudankulam-5","name":"Kudankulam-5","country":"IN","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"kudankulam-4","name":"Kudankulam-4","country":"IN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"khmelnitski-4","name":"Khmelnitski-4","country":"UA","event":"Listed as under construction in the WNA world table","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"suspended"},{"date":"2026-06-16","slug":"khmelnitski-3","name":"Khmelnitski-3","country":"UA","event":"Listed as under construction in the WNA world table","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"suspended"},{"date":"2026-06-16","slug":"kalpakkam-pfbr","name":"Kalpakkam PFBR","country":"IN","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"jinqimen-2","name":"Jinqimen-2","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2031","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"jinqimen-1","name":"Jinqimen-1","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"hinkley-point-c-2","name":"Hinkley Point C-2","country":"GB","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"haiyang-4","name":"Haiyang-4","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"haiyang-3","name":"Haiyang-3","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"el-dabaa-4","name":"El Dabaa-4","country":"EG","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"el-dabaa-3","name":"El Dabaa-3","country":"EG","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"el-dabaa-2","name":"El Dabaa-2","country":"EG","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"changjiang-4","name":"Changjiang-4","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"changjiang-3","name":"Changjiang-3","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"grid_connected"},{"date":"2026-06-16","slug":"carem-25","name":"CAREM-25","country":"AR","event":"Listed as under construction in the WNA world table","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"suspended"},{"date":"2026-06-16","slug":"cape-nagloynyn-2","name":"Cape Nagloynyn-2 (Baimskaya FPU)","country":"RU","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"cape-nagloynyn-1","name":"Cape Nagloynyn-1 (Baimskaya FPU)","country":"RU","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"bushehr-2","name":"Bushehr-2","country":"IR","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"brest-od-300","name":"BREST-OD-300","country":"RU","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"bailong-1","name":"Bailong-1","country":"CN","event":"Listed as under construction in the WNA world table, grid connection estimated 2031","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"angra-3","name":"Angra-3","country":"BR","event":"Listed as under construction in the WNA world table","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"suspended"},{"date":"2026-06-16","slug":"akkuyu-4","name":"Akkuyu-4","country":"TR","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"akkuyu-3","name":"Akkuyu-3","country":"TR","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-16","slug":"akkuyu-2","name":"Akkuyu-2","country":"TR","event":"Listed as under construction in the WNA world table, grid connection estimated 2027","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","status":"under_construction"},{"date":"2026-06-15","slug":"leningrad-ii-3","name":"Leningrad II-3","country":"RU","event":"Core catcher installation completed","source":"https://www.nucnet.org/news/installation-of-core-catcher-completed-at-russia-s-leningrad-2-3-nuclear-plant-6-1-2026","status":"under_construction"},{"date":"2026-06-15","slug":"akkuyu-1","name":"Akkuyu-1","country":"TR","event":"Unit 1 ~99% complete; Rosatom targets fuel loading and startup in fall 2026","source":"https://www.turkiyetoday.com/business/akkuyu-nuclear-power-plants-first-unit-on-track-for-fall-2026-launch-rosatom-3222946","status":"commissioning"},{"date":"2026-06-01","slug":"shin-hanul-4","name":"Shin Hanul-4","country":"KR","event":"First safety-related concrete poured for the reactor building foundation; KHNP targets commercial operation in 2033","source":"https://www.world-nuclear-news.org/articles/construction-starts-for-shin-hanul-unit-4","status":"under_construction"},{"date":"2026-05-10","slug":"taipingling-4","name":"Taipingling-4","country":"CN","event":"First concrete date of the main plant declared by CGN Power (HKEX announcement), marking full-scale construction start of Taipingling unit 4","source":"https://www.world-nuclear-news.org/articles/construction-begins-on-fourth-taipingling-unit","status":"under_construction"},{"date":"2026-04-28","slug":"rooppur-1","name":"Rooppur-1","country":"BD","event":"Stage-B fuel loading began","source":"https://www.world-nuclear-news.org/articles/rooppur-unit-1-completes-key-commissioning-test","status":"commissioning"},{"date":"2026-04-25","slug":"kudankulam-3","name":"Kudankulam-3","country":"IN","event":"'Spill to open reactor' commissioning milestone reached","source":"https://www.world-nuclear-news.org/articles/flushing-of-safety-systems-begins-for-kudankulam-unit-3","status":"commissioning"},{"date":"2026-04-23","slug":"natrium-kemmerer-1","name":"Natrium Demonstration (Kemmerer)","country":"US","event":"Nuclear construction officially commenced; owner expects construction complete by February 2031","source":"https://www.terrapower.com/TerraPower-Commences-Construction-on-Americas-First-Utility-Scale-Advanced-Nuclear-Power-Plant","status":"under_construction"},{"date":"2026-04-06","slug":"kalpakkam-pfbr","name":"Kalpakkam PFBR","country":"IN","event":"First criticality achieved","source":"https://dae.gov.in/prototype-fast-breeder-reactor-at-kalpakkam-tamil-nadu-attains-first-criticality/","status":"under_construction"},{"date":"2026-03-26","slug":"kursk-ii-3","name":"Kursk II-3","country":"RU","event":"Rosatom machine-building division began manufacturing the VVER-TOI reactor vessel for unit 3 at Atommash (Volgodonsk)","source":"https://etc.bellona.org/2026/04/30/weird-kursk-ii/","status":"under_construction"},{"date":"2026-03-04","slug":"natrium-kemmerer-1","name":"Natrium Demonstration (Kemmerer)","country":"US","event":"NRC issued Part 50 construction permit — first commercial non-light-water US power reactor permit in 40+ years","source":"https://www.energy.gov/ne/articles/nrc-issues-construction-permit-terrapowers-natrium-advanced-reactor","status":"under_construction"},{"date":"2026-03-02","slug":"hinkley-point-c-1","name":"Hinkley Point C-1","country":"GB","event":"Unit 1 start-up pushed to 2030 on M&E productivity shortfall; cost estimate £35bn (2015 money)","source":"https://www.industrialisedconstruction.co.uk/2026/03/02/hinkley-point-c-me-productivity-hit-pushes-unit-1-start-up-to-2030/","status":"under_construction"},{"date":"2026-02-12","slug":"angra-3","name":"Angra-3","country":"BR","event":"Brazilian government says it will decide by mid-2026 whether to resume or abandon Angra 3","source":"https://www.reuters.com/business/energy/brazil-decide-by-mid-year-whether-complete-angra-3-nuclear-project-2026-02-12/","status":"suspended"},{"date":"2026-02-05","slug":"paks-ii-1","name":"Paks II-1","country":"HU","event":"First concrete poured for the foundation slab of Paks II unit 1, formally starting construction","source":"https://world-nuclear.org/information-library/country-profiles/countries-g-n/hungary","status":"under_construction"},{"date":"2026-02-01","slug":"sizewell-c-1","name":"Sizewell C-1","country":"GB","event":"~2,000 workers on site as construction ramps","source":"https://www.sizewellc.com/","status":"under_construction"},{"date":"2026-01-20","slug":"hinkley-point-c-1","name":"Hinkley Point C-1","country":"GB","event":"All 24 primary loop welds completed on Unit 1","source":"https://www.newcivilengineer.com/latest/hinkley-point-c-construction-progress-with-civils-on-largest-building-to-be-completed-this-year-07-10-2025/","status":"under_construction"},{"date":"2026-01-16","slug":"xuwei-1","name":"Xuwei-1","country":"CN","event":"Concrete pouring began for the nuclear island of unit 1 at phase I of the Xuwei nuclear heating and power project in Lianyungang, Jiangsu — billed as the world's first large-scale nuclear energy-petrochemical integration project","source":"https://en.cnnc.com.cn/2026-01/20/c_1157963.htm","status":"under_construction"},{"date":"2026-01-12","slug":"hinkley-point-c-2","name":"Hinkley Point C-2","country":"GB","event":"Reactor pressure vessel (500 tonnes, Framatome Saint-Marcel) delivered to the Hinkley Point C site for unit 2","source":"https://www.world-nuclear-news.org/articles/in-pictures-second-hinkley-point-c-reactor-vessel-delivered-to-site","status":"under_construction"},{"date":"2025-12-23","slug":"changjiang-linglong-1","name":"Linglong One (Changjiang SMR)","country":"CN","event":"Non-nuclear turbine test run passed on first attempt","source":"https://www.world-nuclear-news.org/articles/chinese-smr-completes-non-nuclear-steam-start-up-test","status":"commissioning"},{"date":"2025-12-10","slug":"kudankulam-3","name":"Kudankulam-3","country":"IN","event":"First fuel batches delivered to site for Unit 3","source":"https://www.wionews.com/india-news/commissioning-of-kudankulam-unit-3-to-start-in-2026-rosatom-chief-1764940729347","status":"commissioning"},{"date":"2025-11-18","slug":"zhaoyuan-1","name":"Zhaoyuan-1","country":"CN","event":"First safety-related concrete poured for the reactor building of Zhaoyuan unit 1, CGN's first nuclear project in Shandong and its tenth plant site (six HPR1000 units planned; phase 1 approved August 2024)","source":"https://en.cnnc.com.cn/2025-11/19/c_1144251.htm","status":"under_construction"},{"date":"2025-11-18","slug":"sanao-3","name":"San'ao-3 (Cangnan)","country":"CN","event":"First concrete poured for the nuclear island of unit 3 (~8,820 cubic metre pour), marking official start of construction","source":"https://world-nuclear-news.org/articles/third-sanao-unit-under-construction","status":"under_construction"},{"date":"2025-11-15","slug":"sizewell-c-1","name":"Sizewell C-1","country":"GB","event":"Financial close reached with private investors","source":"https://en.wikipedia.org/wiki/Sizewell_C_nuclear_power_station","status":"under_construction"},{"date":"2025-11-15","slug":"el-dabaa-1","name":"El Dabaa-1","country":"EG","event":"Reactor pressure vessel for Unit 1 installed","source":"https://rosatomnewsletter.com/2026/01/26/el-dabaa-a-year-of-steady-growth/","status":"under_construction"},{"date":"2025-11-13","slug":"sanao-3","name":"San'ao-3 (Cangnan)","country":"CN","event":"China's NNSA issued construction permits for San'ao units 3 and 4 after on-site inspection of nuclear island preparations","source":"https://world-nuclear-news.org/articles/third-sanao-unit-under-construction","status":"under_construction"},{"date":"2025-11-06","slug":"angra-3","name":"Angra-3","country":"BR","event":"BNDES/Eletronuclear study finds abandoning Angra 3 (BRL22-26bn) would cost about as much as completing it (BRL23.9bn); target completion 2033 if the government approves","source":"https://www.world-nuclear-news.org/articles/eletronuclear-says-study-backs-angra-3-completion","status":"suspended"},{"date":"2025-11-04","slug":"paks-ii-1","name":"Paks II-1","country":"HU","event":"Hungary's HAEA issued the partial construction licence; Paks II said first concrete was expected in February 2026 — the first EU nuclear first-concrete since Hinkley Point C-2 in December 2019","source":"https://www.nucnet.org/news/hungary-issues-paks-2-partial-permit-as-nuclear-project-moves-towards-first-concrete-in-early-2026-11-4-2025","status":"under_construction"},{"date":"2025-10-15","slug":"changjiang-linglong-1","name":"Linglong One (Changjiang SMR)","country":"CN","event":"Cold functional testing completed","source":"https://www.world-nuclear-news.org/articles/cold-testing-of-chinese-smr-completed","status":"commissioning"},{"date":"2025-10-07","slug":"khmelnitski-3","name":"Khmelnitski-3","country":"UA","event":"Energoatom said Ukraine can complete Khmelnytskyi units 3 and 4 without purchasing the Bulgarian reactors","source":"https://www.pravda.com.ua/eng/news/2025/10/07/8001654/","status":"suspended"},{"date":"2025-07-22","slug":"sizewell-c-1","name":"Sizewell C-1","country":"GB","event":"UK final investment decision; ~£38bn project cost announced","source":"https://www.gov.uk/","status":"under_construction"},{"date":"2025-07-17","slug":"hinkley-point-c-2","name":"Hinkley Point C-2","country":"GB","event":"Containment building dome hoisted into place at unit 2, completing major civil works on the reactor building","source":"https://www.world-nuclear-news.org/articles/containment-dome-of-hinkley-point-c-unit-2-installed","status":"under_construction"},{"date":"2025-06-10","slug":"taipingling-3","name":"Taipingling-3","country":"CN","event":"First safety-related concrete poured for the reactor building of unit 3, marking official start of construction (phase 2 approved by the State Council 2023-12-29)","source":"https://www.world-nuclear-news.org/articles/construction-under-way-of-third-taipingling-unit","status":"under_construction"},{"date":"2025-05-20","slug":"shin-hanul-3","name":"Shin Hanul-3","country":"KR","event":"First safety-related concrete poured for the reactor building; KHNP targets commercial operation in 2032","source":"https://www.world-nuclear-news.org/articles/construction-of-new-korean-reactor-begins","status":"under_construction"},{"date":"2025-04-16","slug":"khmelnitski-3","name":"Khmelnitski-3","country":"UA","event":"Bulgaria reversed its decision to sell the two stored VVER-1000 reactors (ex-Belene) and other equipment that had been earmarked for completing Khmelnytskyi units 3 and 4","source":"https://www.oecd-nea.org/jcms/pl_66130/ukraine-current-status-of-nuclear-power-installations","status":"suspended"},{"date":"2025-04-04","slug":"darlington-bwrx-300-1","name":"Darlington New Nuclear — BWRX-300 Unit 1","country":"CA","event":"CNSC licence to construct granted; OPG/Ontario approved ~C$20.9bn for four units","source":"https://world-nuclear-news.org/","status":"under_construction"},{"date":"2024-12-30","slug":"chashma-5","name":"Chashma-5 (C-5)","country":"PK","event":"First concrete poured","source":"https://www.neimagazine.com/news/pakistan-begins-construction-of-chashma-5/","status":"under_construction"},{"date":"2024-06-10","slug":"natrium-kemmerer-1","name":"Natrium Demonstration (Kemmerer)","country":"US","event":"Non-nuclear construction began at Kemmerer, Wyoming","source":"https://www.terrapower.com/","status":"under_construction"},{"date":"2024-01-23","slug":"hinkley-point-c-1","name":"Hinkley Point C-1","country":"GB","event":"EDF announced revised schedule (Unit 1 2029-2031) and cost range £31-35bn (2015 money)","source":"https://www.edfenergy.com/","status":"under_construction"},{"date":"2024-01-23","slug":"el-dabaa-4","name":"El Dabaa-4","country":"EG","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2023-10-05","slug":"rooppur-1","name":"Rooppur-1","country":"BD","event":"First fuel delivered to site","source":"https://world-nuclear-news.org/","status":"commissioning"},{"date":"2023-06-20","slug":"chashma-5","name":"Chashma-5 (C-5)","country":"PK","event":"Pakistan-CNNC contract signed (~$4.8bn)","source":"https://world-nuclear-news.org/","status":"under_construction"},{"date":"2023-05-03","slug":"el-dabaa-3","name":"El Dabaa-3","country":"EG","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2023-04-27","slug":"akkuyu-1","name":"Akkuyu-1","country":"TR","event":"First fuel delivered to site; plant designated a nuclear facility","source":"https://world-nuclear-news.org/","status":"commissioning"},{"date":"2022-11-19","slug":"el-dabaa-2","name":"El Dabaa-2","country":"EG","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2022-07-20","slug":"el-dabaa-1","name":"El Dabaa-1","country":"EG","event":"First concrete, Unit 1","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2022-06-28","slug":"sanmen-3","name":"Sanmen-3","country":"CN","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2021-12-20","slug":"kudankulam-6","name":"Kudankulam-6","country":"IN","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2021-07-28","slug":"xudabao-3","name":"Xudabao-3","country":"CN","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2021-07-13","slug":"changjiang-linglong-1","name":"Linglong One (Changjiang SMR)","country":"CN","event":"First concrete — world's first onshore commercial SMR construction start","source":"https://pris.iaea.org/pris/","status":"commissioning"},{"date":"2021-06-29","slug":"kudankulam-5","name":"Kudankulam-5","country":"IN","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2021-06-08","slug":"brest-od-300","name":"BREST-OD-300","country":"RU","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2021-05-19","slug":"tianwan-7","name":"Tianwan-7","country":"CN","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2021-03-31","slug":"changjiang-3","name":"Changjiang-3","country":"CN","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"grid_connected"},{"date":"2018-12-11","slug":"hinkley-point-c-1","name":"Hinkley Point C-1","country":"GB","event":"First nuclear concrete poured (official construction start)","source":"https://world-nuclear-news.org/","status":"under_construction"},{"date":"2018-07-14","slug":"rooppur-2","name":"Rooppur-2","country":"BD","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2018-04-03","slug":"akkuyu-1","name":"Akkuyu-1","country":"TR","event":"First concrete, Unit 1","source":"https://pris.iaea.org/pris/","status":"commissioning"},{"date":"2017-12-29","slug":"xiapu-1","name":"Xiapu-1 (CFR-600)","country":"CN","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2017-11-30","slug":"rooppur-1","name":"Rooppur-1","country":"BD","event":"First concrete, Unit 1","source":"https://pris.iaea.org/pris/","status":"commissioning"},{"date":"2017-10-23","slug":"kudankulam-4","name":"Kudankulam-4","country":"IN","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/","status":"under_construction"},{"date":"2017-06-29","slug":"kudankulam-3","name":"Kudankulam-3","country":"IN","event":"First concrete, Unit 3","source":"https://pris.iaea.org/pris/","status":"commissioning"}]}