{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"akkuyu-3","name":"Akkuyu-3","plant":"Akkuyu","unit":3,"country":"TR","region":"europe","reactor_type":"PWR","design":"VVER-1200","capacity_mw_net":1114,"is_smr":false,"vendor":"Rosatom","owner_operator":"Akkuyu Nuclear JSC (Rosatom BOO)","vendor_id":"org:rosatom","owner_operator_ids":["org:akkuyu-nuclear"],"design_id":"design:vver-1200","site_id":"site:akkuyu","status":"under_construction","construction_start":2021,"original_cod_target":null,"current_cod_estimate":2028,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2025-07-30","event":"Concreting of turbine building walls completed at unit 3","source":"https://rosatom-energy.ru/en/projects/akkuyu/"},{"date":"2026-05-25","event":"Main 350-t overhead crane installed in the unit-3 turbine hall (6-hour lift); enables turbine-equipment installation and roof completion","source":"https://akkuyu.com/en/news/the-main-overhead-crane-installed-in-the-turbine-hall-of-akkuyu-npp-unit-3"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://rosatom-energy.ru/en/projects/akkuyu/","https://rosatomnewsletter.com/2026/01/26/akkuyu-on-the-homestretch/","https://www.titan2.ru/en/media-press/lenta-novostej/46-projects-news/2915-bridge-crane-with-350-t-load-lifting-capacity-installed-in-turbine-building-of-akkuyu-npp-power-unit-3-under-construction-in-t-rkiye"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"Verified 2026-09-28: 350-t turbine-hall crane installed May 2026 (Akkuyu Nuclear operator + Titan-2 contractor + Turkiye Today + Rosatom newsletter). Turbine wall concreting Jul 2025. 2028 grid connection per WNA table. Unit 1 construction completed 2026-06-23.","tags":["tr","vver-1200"],"updated_at":"2026-09-28","slippage_years":null}}