{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"angra-3","name":"Angra-3","plant":"Angra","unit":3,"country":"BR","region":"south-america","reactor_type":"PWR","design":"Pre-Konvoi PWR","capacity_mw_net":1340,"is_smr":false,"vendor":"Siemens/KWU lineage","owner_operator":"Eletronuclear","vendor_id":"org:framatome","owner_operator_ids":["org:eletronuclear"],"design_id":"design:pre-konvoi","site_id":"site:angra","status":"suspended","construction_start":2010,"original_cod_target":null,"current_cod_estimate":null,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2025-11-06","event":"BNDES/Eletronuclear study finds abandoning Angra 3 (BRL22-26bn) would cost about as much as completing it (BRL23.9bn); target completion 2033 if the government approves","source":"https://www.world-nuclear-news.org/articles/eletronuclear-says-study-backs-angra-3-completion"},{"date":"2026-02-12","event":"Brazilian government says it will decide by mid-2026 whether to resume or abandon Angra 3","source":"https://www.reuters.com/business/energy/brazil-decide-by-mid-year-whether-complete-angra-3-nuclear-project-2026-02-12/"},{"date":"2026-08-03","event":"Decision on Angra 3 deferred — expected to fall to Brazil's next president, who takes office in 2027","source":"https://valorinternational.globo.com/business/news/2026/08/03/decision-on-angra-3-project-will-fall-to-brazils-next-president.ghtml"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=BR","https://www.world-nuclear-news.org/articles/eletronuclear-says-study-backs-angra-3-completion","https://www.reuters.com/business/energy/brazil-decide-by-mid-year-whether-complete-angra-3-nuclear-project-2026-02-12/"],"last_verified":"2026-09-08","verified":true,"confidence":"medium","notes":"Originally started 1984; multiple suspensions (~65% complete). Status stays suspended: completion would target 2033 per the Nov 2025 BNDES-backed study, but the go/no-go decision was deferred in Aug 2026 to the next president (office 2027). PRIS still lists the unit as under construction; WNA marks it suspended.","tags":["br","pre-konvoi"],"updated_at":"2026-09-08","slippage_years":null}}