{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"bailong-1","name":"Bailong-1","plant":"Bailong","unit":1,"country":"CN","region":"asia","reactor_type":"PWR","design":"CAP1000","capacity_mw_net":1161,"is_smr":false,"vendor":"SPIC (CAP1000)","owner_operator":"SPIC","vendor_id":"org:spic","owner_operator_ids":["org:spic"],"design_id":"design:cap1000","site_id":"site:bailong","status":"under_construction","construction_start":2024,"original_cod_target":null,"current_cod_estimate":2031,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2031","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-03-24","event":"CA20 structural module installed in the nuclear island (largest/heaviest NI structural module campaign)","source":"https://www.neimagazine.com/news/key-module-installed-at-bailong-1/"},{"date":"2026-08-16","event":"First inner steel containment ring (CV1R) lifted into design position (4-hour operation, per SPIC)","source":"https://www.nucnet.org/news/china-installs-first-ring-of-steel-containment-at-bailong-1-nuclear-plant-8-1-2026"}],"sources":["https://world-nuclear.org/nuclear-reactor-database/summary/report?report=gen&status=Under%20Construction","https://pris.iaea.org/pris/","https://pris-stats.iaea.org/reactor/reactors-by-code/CN","https://world-nuclear.org/nuclear-reactor-database/details/Bailong-1","https://www.nucnet.org/news/china-installs-first-ring-of-steel-containment-at-bailong-1-nuclear-plant-8-1-2026","https://www.neimagazine.com/news/key-module-installed-at-bailong-1/"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"CA01 module (1,167 t) set 2026-08-29 per CINIE — single source, not asserted. construction start definitional note: excavation Dec 2024, FCD Dec 2025 per WNA/SNERDI (PRIS uses FCD); populated 2024 value frozen pending PRIS-direct review. Net capacity 1161 MWe per the WNA reactor database (1161 net / 1250 gross, data credited to IAEA PRIS), the one source listing both Bailong units, so both carry the same figure (set 2026-10-13); IAEA PRIS's own page showed 1160 net / 1254 gross (3400 MWt; PRIS id 2169) on 2026-10-12. The 1.25 GW per-unit figure in press reports is gross. The 1.25 GW per-unit figure in press reports is gross. PRIS (checked 2026-10-12) also gives construction start 2025-12-22 and construction licence 2024-09-27.","tags":["cn","cap1000"],"updated_at":"2026-10-13","slippage_years":null}}