{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"bailong-2","name":"Bailong-2","plant":"Bailong","unit":2,"country":"CN","region":"asia","reactor_type":"PWR","design":"CAP1000","capacity_mw_net":1250,"is_smr":false,"vendor":"SPIC (CAP1000)","owner_operator":"SPIC","vendor_id":"org:spic","owner_operator_ids":["org:spic"],"design_id":"design:cap1000","site_id":"site:bailong","status":"under_construction","construction_start":"2026-09-27","original_cod_target":null,"current_cod_estimate":2031,"milestones":[{"date":"2026-09-27","event":"First concrete poured for the nuclear island at 18:27, officially starting construction; each Phase I unit is described as 1.25 GW.","source":"https://www.world-nuclear-news.org/articles/first-concrete-poured-for-bailong-2-nuclear-power-unit"}],"sources":["https://www.world-nuclear-news.org/articles/first-concrete-poured-for-bailong-2-nuclear-power-unit","https://en.sxcoal.com/news/detail/2104389552271728642"],"last_verified":"2026-10-07","verified":true,"confidence":"medium","notes":"The two independent reports agree Phase I CAP1000 units are 1.25 GW each. COD estimate 2031 based on 56-month construction period from September 2026; not independently specified as a calendar-year estimate.","tags":["cn","cap1000"],"updated_at":"2026-10-07","slippage_years":null}}