{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"bushehr-2","name":"Bushehr-2","plant":"Bushehr","unit":2,"country":"IR","region":"middle-east-africa","reactor_type":"PWR","design":"VVER-1000","capacity_mw_net":974,"is_smr":false,"vendor":"Rosatom","owner_operator":"NPPD (Iran)","epc":"JSC ASE (Rosatom Engineering Division)","vendor_id":"org:rosatom","owner_operator_ids":["org:nppd-iran"],"epc_ids":["org:atomstroyexport"],"design_id":"design:vver-1000","site_id":"site:bushehr","status":"under_construction","construction_start":2019,"original_cod_target":null,"current_cod_estimate":2028,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-01-07","event":"Third tier of inner containment installed (12 sections, 4 weeks, structure to 40 m); fourth ring scheduled 2026 (AEOI)","source":"https://www.world-nuclear-news.org/articles/third-tier-of-irans-bushehr-2-nuclear-power-unit-installed"},{"date":"2026-05-11","event":"Likhachev progress update: unit-2 reactor >60% complete, steam generators 50%; key-equipment shipping planned next year; ~2,200 Iranian contractors back on site","source":"https://www.world-nuclear-news.org/articles/rosatom-continuing-work-on-irans-bushehr-units-two-and-three"},{"date":"2026-08-10","event":"First 5 evacuated Russian specialists return (25 on site); staff to reach 100 by autumn conditional on no escalation","source":"https://www.world-nuclear-news.org/articles/rosatom-staff-returning-to-irans-bushehr-nuclear-plant"}],"sources":["https://world-nuclear.org/nuclear-reactor-database/summary/report?report=gen&status=Under%20Construction","https://pris.iaea.org/pris/","https://www.world-nuclear-news.org/articles/third-tier-of-irans-bushehr-2-nuclear-power-unit-installed","https://www.world-nuclear-news.org/articles/rosatom-staff-returning-to-irans-bushehr-nuclear-plant","https://www.neimagazine.com/news/bushehr-workforce-set-for-expansion/"],"last_verified":"2026-09-28","verified":true,"confidence":"high","notes":"War-impact watch item: Russian staff evacuated after strikes, partial return from Aug 2026. Iran targets unit-2 operation 2029 (IAEA GC Sep 2024) vs tracker 2028 — COD tension noted, estimate unchanged pending operator statement.","tags":["ir","vver-1000"],"updated_at":"2026-09-28","slippage_years":null}}