{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"cape-nagloynyn-2","name":"Cape Nagloynyn-2 (Baimskaya FPU)","plant":"Cape Nagloynyn","unit":2,"country":"RU","region":"asia","reactor_type":"PWR","design":"RITM-200S","capacity_mw_net":50,"is_smr":true,"vendor":"Rosatom (OKBM)","owner_operator":"Rosatom","vendor_id":"org:okbm-afrikantov","owner_operator_ids":["org:rosatom"],"design_id":"design:ritm-200s","site_id":"site:cape-nagloynyn","status":"under_construction","construction_start":null,"original_cod_target":null,"current_cod_estimate":2028,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-09-24","event":"Second RITM-200S reactor unit manufactured at ZiO-Podolsk; passed hydraulic tests and control-assembly checks (first unit at shipyard awaiting installation)","source":"https://www.world-nuclear-news.org/articles/second-reactor-manufactured-for-floating-nuclear-plant"}],"sources":["https://world-nuclear.org/nuclear-reactor-database/summary/report?report=gen&status=Under%20Construction","https://pris.iaea.org/pris/","https://www.world-nuclear-news.org/articles/second-reactor-manufactured-for-floating-nuclear-plant"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"Covered by NNN newsroom 2026-09-25 (second-reactor-manufactured-for-floating-nuclear-plant) citing Rosatom + WNN. Reactor pair completes the first PEB-106; hull integration and commissioning dates still ahead.","tags":["ru","ritm-200s","smr"],"updated_at":"2026-09-28","slippage_years":null}}