{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"carem-25","name":"CAREM-25","plant":"Lima (CNEA)","unit":1,"country":"AR","region":"south-america","reactor_type":"PWR","design":"CAREM-25","capacity_mw_net":25,"is_smr":true,"vendor":"CNEA","owner_operator":"CNEA","vendor_id":"org:cnea","owner_operator_ids":["org:cnea"],"design_id":"design:carem-25","site_id":"site:lima-carem","status":"suspended","construction_start":"2014-02","original_cod_target":null,"current_cod_estimate":null,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2025-03-01","event":"CNEA formally suspended construction to concentrate budget on engineering; preservation crew later cut from ~30 to ~7 (reported Jul-Aug 2026; exact suspension date unclear)","source":"https://reactoratlas.com/en/wiki/carem-25"},{"date":"2026-08-26","event":"Government confirms full paralyzation of civil works; 171 construction workers fired (140 UOCRA + 31 UECARA); dismissed workers blockade Route 9 at km 103","source":"https://monitorgremial.com.ar/el-gobierno-confirma-la-paralizacion-de-la-obra-y-despide-a-171-trabajadores-del-proyecto-carem-25/"},{"date":"2026-09-25","event":"UOCRA demands President Milei reverse the halt; 600+ construction jobs at risk after indefinite strike earlier in September over mass firings","source":"https://monitorgremial.com.ar/la-uocra-le-reclama-a-milei-por-la-finalizacion-del-reactor-nuclear-de-zarate/"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://reactoratlas.com/en/wiki/carem-25","https://laroscadigital.com.ar/el-proyecto-carem-25-paralizacion-asignacion-presupuestaria-y-cambios-en-la-conduccion-estatal/"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"Status suspended (not cancelled): 2026 budget carries zero for CAREM; CNEA -58% real vs 2023. First-grid target contested — late 2027 (Reactor Atlas) vs 2028 per schedule valid to Dec 2023 (La Rosca); original COD target not recorded. Civil works 80% / total 65% at Dec 2023, US$600M+ invested (ex-officials via La Rosca). Site flooding and containment-liner oxidation per CNEA engineer testimony — single source, unconfirmed.","tags":["ar","carem-25","smr"],"updated_at":"2026-09-28","slippage_years":null}}