{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"chashma-5","name":"Chashma-5 (C-5)","plant":"Chashma","unit":5,"country":"PK","region":"asia","reactor_type":"PWR","design":"Hualong One (HPR1000)","capacity_mw_net":1100,"is_smr":false,"vendor":"CNNC","owner_operator":"Pakistan Atomic Energy Commission","vendor_id":"org:cnnc","owner_operator_ids":["org:paec"],"design_id":"design:hualong-one","site_id":"site:chashma","status":"under_construction","construction_start":"2024-12-30","original_cod_target":2030,"current_cod_estimate":2030,"milestones":[{"date":"2023-06-20","event":"Pakistan-CNNC contract signed (~$4.8bn)","source":"https://world-nuclear-news.org/"},{"date":"2024-12-30","event":"First concrete poured","source":"https://www.neimagazine.com/news/pakistan-begins-construction-of-chashma-5/"},{"date":"2026-09-16","event":"Pakistan-IAEA safeguards agreement for C-5 signed in Vienna (PAEC chairman + DG Grossi, CAEA witness; Board approved Mar 2026)","source":"https://www.neimagazine.com/news/chashma-5-safeguards-agreement-signed/"}],"sources":["https://world-nuclear.org/nuclear-reactor-database/details/Chashma-Nuclear-Power-Plant-5","https://pris.iaea.org/pris/","https://www.neimagazine.com/news/chashma-5-safeguards-agreement-signed/"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"Chinese export Hualong One build (~$3.7-4.8bn reported range); 7-8 year construction stated at groundbreaking, which puts a 2030 COD at the optimistic end. Dome placement completed early (NEI/PAEC, single origin) — noted. COD tension: PAEC targets 2028 commissioning vs Foreign Ministry 2030 — estimate 2030 retained pending fuel-load progress.","tags":["pakistan","cnnc","hualong-one","china-export"],"updated_at":"2026-09-28","slippage_years":0}}