{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"el-dabaa-2","name":"El Dabaa-2","plant":"El Dabaa","unit":2,"country":"EG","region":"middle-east-africa","reactor_type":"PWR","design":"VVER-1200","capacity_mw_net":1110,"is_smr":false,"vendor":"Rosatom","owner_operator":"NPPA","vendor_id":"org:rosatom","owner_operator_ids":["org:nppa"],"design_id":"design:vver-1200","site_id":"site:el-dabaa","status":"under_construction","construction_start":"2022-11-19","original_cod_target":null,"current_cod_estimate":2030,"milestones":[{"date":"2022-11-19","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/"},{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-07-09","event":"330-t reactor pressure vessel installed at unit 2 (7 months after unit 1's vessel)","source":"https://www.world-nuclear-news.org/articles/reactor-vessel-installed-in-el-dabaas-second-unit"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://www.world-nuclear-news.org/articles/reactor-vessel-installed-in-el-dabaas-second-unit"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"Unit-2 RPV installed 2026-07-09 (WNN; corroborated by Rosatom newsletter coverage of the installation ceremony). Plant-level Sep 2026: ministerial fuel-delivery review (fuel 2027), KHNP turbine-hall progress review, 6-unit expansion study — see el-dabaa-1 notes.","tags":["eg","vver-1200"],"updated_at":"2026-09-28","slippage_years":null}}