{"docs":"https://www.nuclearnewsnetwork.com/tracker","unit":{"slug":"el-dabaa-3","name":"El Dabaa-3","plant":"El Dabaa","unit":3,"country":"EG","region":"middle-east-africa","reactor_type":"PWR","design":"VVER-1200","capacity_mw_net":1110,"is_smr":false,"vendor":"Rosatom","owner_operator":"NPPA","status":"under_construction","construction_start":"2023-05-03","original_cod_target":null,"current_cod_estimate":2030,"milestones":[{"date":"2023-05-03","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/"},{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/"],"last_verified":"2026-07-13","verified":false,"confidence":"low","notes":"Bulk-seeded 2026-07-13 from the WNA under-construction table (updated 2026-06-16). Capacity is design-typical net output; construction dates are provisional. Verification agent to confirm against IAEA PRIS and append milestones.","tags":["eg","vver-1200"],"updated_at":"2026-07-13","slippage_years":null}}