{"docs":"https://www.nuclearnewsnetwork.com/tracker","unit":{"slug":"hinkley-point-c-2","name":"Hinkley Point C-2","plant":"Hinkley Point C","unit":2,"country":"GB","region":"europe","reactor_type":"PWR","design":"EPR","capacity_mw_net":1630,"is_smr":false,"vendor":"EDF/Framatome","owner_operator":"NNB Generation Company (EDF)","status":"under_construction","construction_start":2020,"original_cod_target":null,"current_cod_estimate":2030,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/"],"last_verified":"2026-07-13","verified":false,"confidence":"low","notes":"Reactor pressure vessel installed June 2026; tracks ~12 months behind unit 1. Bulk-seeded 2026-07-13 from the WNA under-construction table (updated 2026-06-16). Capacity is design-typical net output; construction dates are provisional. Verification agent to confirm against IAEA PRIS and append milestones.","tags":["gb","epr"],"updated_at":"2026-07-13","slippage_years":null}}