{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"kudankulam-6","name":"Kudankulam-6","plant":"Kudankulam","unit":6,"country":"IN","region":"asia","reactor_type":"PWR","design":"VVER-1000","capacity_mw_net":917,"is_smr":false,"vendor":"Rosatom","owner_operator":"NPCIL","epc":"JSC ASE (Rosatom Engineering Division)","vendor_id":"org:rosatom","owner_operator_ids":["org:npcil"],"epc_ids":["org:atomstroyexport"],"design_id":"design:vver-1000","site_id":"site:kudankulam","status":"under_construction","construction_start":"2021-12-20","original_cod_target":null,"current_cod_estimate":2029,"milestones":[{"date":"2021-12-20","event":"Construction start (first concrete)","source":"https://pris.iaea.org/pris/"},{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-04-30","event":"AERB grants permission for major equipment erection (shared units 5&6 clearance)","source":"https://www.pib.gov.in/PressReleasePage.aspx?PRID=2257371&lang=2&reg=3"}],"sources":["https://world-nuclear.org/nuclear-reactor-database/summary/report?report=gen&status=Under%20Construction","https://pris.iaea.org/pris/","https://www.pib.gov.in/PressReleasePage.aspx?PRID=2257371&lang=2&reg=3"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"320-t RPV shipped from Atommash for unit 6 (Rosatom press release, Jun 2026) — single source, not asserted; needs WNN/NEI or arrival confirmation. Likhachev Sep 2026 schedule (units 5&6 commissioning 2028-29, single source) corroborates current COD estimate 2029.","tags":["in","vver-1000"],"updated_at":"2026-09-28","slippage_years":null}}