{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"kursk-ii-2","name":"Kursk II-2","plant":"Kursk II","unit":2,"country":"RU","region":"europe","reactor_type":"PWR","design":"VVER-TOI","capacity_mw_net":1175,"is_smr":false,"vendor":"Rosatom","owner_operator":"Rosenergoatom","epc":"JSC ASE (Rosatom Engineering Division)","vendor_id":"org:rosatom","owner_operator_ids":["org:rosenergoatom"],"epc_ids":["org:atomstroyexport"],"design_id":"design:vver-toi","site_id":"site:kursk-ii","status":"under_construction","construction_start":"2019-04","original_cod_target":null,"current_cod_estimate":2026,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=RU"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"COD tension flagged 2026-09-28: WNA table said grid 2026 but Sep 2026 has no startup; NEI Mar 2026 expects unit-2 operation in 2027 — estimate retained at 2026 pending Rosatom/WNA revision. Context: unit 1 (Kursk II-1) entered commercial operation 2026-05-01 after Dec 2025 grid connection (WNN/Rosenergoatom); all four VVER-TOI units targeted by 2034.","tags":["ru","vver-toi"],"updated_at":"2026-09-28","slippage_years":null}}