{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"lianjiang-1","name":"Lianjiang-1","plant":"Lianjiang","unit":1,"country":"CN","region":"asia","reactor_type":"PWR","design":"CAP1000","capacity_mw_net":1150,"is_smr":false,"vendor":"SPIC (CAP1000)","owner_operator":"SPIC","vendor_id":"org:spic","owner_operator_ids":["org:spic"],"design_id":"design:cap1000","site_id":"site:lianjiang","status":"under_construction","construction_start":"2023-09","original_cod_target":null,"current_cod_estimate":2028,"milestones":[{"date":"2026-01-29","event":"Full-scope simulator for Lianjiang Phase I passed on-site acceptance testing (214/214 procedures)","source":"https://www.world-nuclear-news.org/articles/lianjiang-simulator-completes-on-site-acceptance-testing"},{"date":"2026-05-29","event":"Outer containment dome (~1,000 t steel, 41 m diameter) installed; reactor building main structure complete, transitioning from civil works to large-scale equipment installation","source":"https://www.world-nuclear-news.org/articles/containment-dome-installed-at-lianjiang-1"},{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://www.world-nuclear-news.org/articles/containment-dome-installed-at-lianjiang-1","https://www.nucnet.org/news/china-announces-milestones-at-two-nuclear-power-plants-6-1-2026","https://www.neimagazine.com/news/lianjiang-unit-1-dome-installed/","https://www.world-nuclear-news.org/articles/lianjiang-simulator-completes-on-site-acceptance-testing"],"last_verified":"2026-09-15","verified":true,"confidence":"high","notes":"Outer containment dome (May 2026) complements baseline Feb 2026 inner containment dome — both WNN (CNNC announcement) + NucNet + NEI corroborated. All main nuclear-island equipment (RPV, 2 SGs, pressuriser) installed per CNEA/NucNet (Oct 2025). No Aug-Sep 2026 milestone found. COD 2028 unchanged.","tags":["cn","cap1000"],"updated_at":"2026-09-15","slippage_years":null}}