{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"lianjiang-2","name":"Lianjiang-2","plant":"Lianjiang","unit":2,"country":"CN","region":"asia","reactor_type":"PWR","design":"CAP1000","capacity_mw_net":1150,"is_smr":false,"vendor":"SPIC (CAP1000)","owner_operator":"SPIC","vendor_id":"org:spic","owner_operator_ids":["org:spic"],"design_id":"design:cap1000","site_id":"site:lianjiang","status":"under_construction","construction_start":2024,"original_cod_target":null,"current_cod_estimate":2029,"milestones":[{"date":"2026-04-01","event":"Reactor pressure vessel (~270 t net) hoisted into place; SPIC says this marks start of equipment installation phase for both phase-1 units","source":"https://world-nuclear-news.org/articles/reactor-vessel-installed-at-lianjiang-unit-2"},{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://world-nuclear-news.org/articles/reactor-vessel-installed-at-lianjiang-unit-2","https://www.world-nuclear-news.org/articles/largest-module-installed-at-second-lianjiang-unit"],"last_verified":"2026-09-15","verified":true,"confidence":"medium","notes":"RPV installed 2026-04-01 (WNN quoting SPIC) — milestone single-source so far. First concrete 26 Apr 2024 per contemporaneous WNN reporting (NEI's 'April 2025' appears to be an error). CA01 super module installed Jan 2025. No Aug-Sep 2026 milestone found. COD 2029 per SPIC/WNA.","tags":["cn","cap1000"],"updated_at":"2026-09-15","slippage_years":null}}