{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"lufeng-1","name":"Lufeng-1","plant":"Lufeng","unit":1,"country":"CN","region":"asia","reactor_type":"PWR","design":"CAP1000","capacity_mw_net":1150,"is_smr":false,"vendor":"SPIC (CAP1000)","owner_operator":"CGN","vendor_id":"org:spic","owner_operator_ids":["org:cgn"],"design_id":"design:cap1000","site_id":"site:lufeng","status":"under_construction","construction_start":2024,"original_cod_target":null,"current_cod_estimate":2030,"milestones":[{"date":"2025-02-24","event":"Correction: first safety-related concrete poured 2025-02-24 per CNNC — earlier baseline listed construction start as 2024","source":"https://en.cnnc.com.cn/2025-02/25/c_1083930.htm"},{"date":"2026-06-10","event":"Second ring of steel inner containment installed (containment = 2 dome segments + 3 steel rings)","source":"https://www.nucnet.org/news/china-installs-second-ring-of-steel-containment-at-lufeng-1-6-5-2026"},{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-07-14","event":"Reactor pressure vessel installed; CGN marks beginning of peak period for nuclear-island main system equipment installation","source":"https://www.world-nuclear-news.org/articles/reactor-vessel-installed-at-lufeng-unit-1"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://en.cnnc.com.cn/2025-02/25/c_1083930.htm","https://www.nucnet.org/news/china-installs-second-ring-of-steel-containment-at-lufeng-1-6-5-2026","https://www.world-nuclear-news.org/articles/reactor-vessel-installed-at-lufeng-unit-1","https://www.neimagazine.com/news/china-pours-first-concrete-for-lufeng-2/"],"last_verified":"2026-09-15","verified":true,"confidence":"high","notes":"Correction: first safety-related concrete poured 2025-02-24 (CNNC, corroborated by WNN/NEI) — the recorded construction start is kept, since the log is append-only; correction recorded as milestone. RPV installed 2026-07-14 and second containment steel ring 2026-06-10 per CGN/CNNPN statements via WNN/NucNet. WNN states both Lufeng-1 and -2 scheduled to begin operating in 2030, consistent with baseline. No Aug-Sep 2026 milestone found.","tags":["cn","cap1000"],"updated_at":"2026-09-15","slippage_years":null}}