{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"lufeng-2","name":"Lufeng-2","plant":"Lufeng","unit":2,"country":"CN","region":"asia","reactor_type":"PWR","design":"CAP1000","capacity_mw_net":1150,"is_smr":false,"vendor":"SPIC (CAP1000)","owner_operator":"CGN","vendor_id":"org:spic","owner_operator_ids":["org:cgn"],"design_id":"design:cap1000","site_id":"site:lufeng","status":"under_construction","construction_start":2025,"original_cod_target":null,"current_cod_estimate":2030,"milestones":[{"date":"2025-12","event":"First concrete poured (NEI Jan 2026 and NucNet June 2026 reporting), consistent with baseline construction start 2025","source":"https://www.neimagazine.com/news/china-pours-first-concrete-for-lufeng-2/"},{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2031","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-07-21","event":"CA01 'super module' (>950 t, 26x29x23 m, 47 sub-modules) installed, advancing reactor building into new phase of nuclear-island structure construction","source":"https://world-nuclear-news.org/articles/landmark-module-installation-at-lufeng-2"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://world-nuclear-news.org/articles/landmark-module-installation-at-lufeng-2","https://www.neimagazine.com/news/china-pours-first-concrete-for-lufeng-2/","https://www.nucnet.org/news/china-installs-second-ring-of-steel-containment-at-lufeng-1-6-5-2026"],"last_verified":"2026-09-15","verified":true,"confidence":"medium","notes":"CA01 super module installed 2026-07-21 (single-source: CGN via WNN). WNN states both Lufeng CAP1000 units scheduled to begin operating in 2030 — earlier than baseline 2031; COD set to 2030 as latest operator-adjacent statement but flagged for re-verification against official CGN schedule. No Aug-Sep 2026 milestone found.","tags":["cn","cap1000"],"updated_at":"2026-09-15","slippage_years":null}}