{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"lufeng-5","name":"Lufeng-5","plant":"Lufeng","unit":5,"country":"CN","region":"asia","reactor_type":"PWR","design":"Hualong One","capacity_mw_net":1090,"is_smr":false,"vendor":"CGN","owner_operator":"CGN","vendor_id":"org:cgn","owner_operator_ids":["org:cgn"],"design_id":"design:hualong-one","site_id":"site:lufeng","status":"under_construction","construction_start":2022,"original_cod_target":null,"current_cod_estimate":2028,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2028","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-04-27","event":"Cold functional testing completed at Lufeng-5","source":"https://www.nucnet.org/news/china-announces-commissioning-milestones-at-two-nuclear-plants-4-3-2026"},{"date":"2026-09-18","event":"Containment structural integrity and integrated leak-rate tests completed at Lufeng-5","source":"https://world-nuclear-news.org/articles/containment-tests-completed-at-lufeng-unit-5"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/","https://www.nucnet.org/news/china-announces-commissioning-milestones-at-two-nuclear-plants-4-3-2026","https://world-nuclear-news.org/articles/containment-tests-completed-at-lufeng-unit-5"],"last_verified":"2026-09-22","verified":true,"confidence":"high","notes":"Verified 2026-09-22: cold tests completed April 2026 (NucNet) and containment integrity/leak-rate tests completed September 2026 (WNN/CGN). Grid connection 2028 per NucNet and WNA table; a WNN background note says units 5/6 expected operating 2027/2028 — disagreement noted, 2028 retained.","tags":["cn","hualong"],"updated_at":"2026-09-22","slippage_years":null}}