{"docs":"https://www.nuclearnewsnetwork.com/tracker","unit":{"slug":"mochovce-4","name":"Mochovce-4","plant":"Mochovce","unit":4,"country":"SK","region":"europe","reactor_type":"PWR","design":"VVER-440/V-213","capacity_mw_net":440,"is_smr":false,"vendor":"Škoda/Rosatom lineage","owner_operator":"Slovenské elektrárne","status":"under_construction","construction_start":1987,"original_cod_target":null,"current_cod_estimate":2026,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2026","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/"],"last_verified":"2026-07-13","verified":false,"confidence":"low","notes":"Soviet-era start; completion resumed decades later — unit 3 entered service 2023. Bulk-seeded 2026-07-13 from the WNA under-construction table (updated 2026-06-16). Capacity is design-typical net output; construction dates are provisional. Verification agent to confirm against IAEA PRIS and append milestones.","tags":["sk","vver-440"],"updated_at":"2026-07-13","slippage_years":null}}