{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"ningde-6","name":"Ningde-6","plant":"Ningde","unit":6,"country":"CN","region":"asia","reactor_type":"PWR","design":"Hualong One","capacity_mw_net":1090,"is_smr":false,"vendor":"CGN","owner_operator":"CGN & Datang","vendor_id":"org:cgn","owner_operator_ids":["org:cgn","org:china-datang"],"design_id":"design:hualong-one","site_id":"site:ningde","status":"under_construction","construction_start":2025,"original_cod_target":null,"current_cod_estimate":2030,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2030","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"},{"date":"2026-07-31","event":"Conventional-island turbine-foundation raft concrete completed (July 2026; exact day N/A)","source":"https://en.cinie.net/article/61285.html"},{"date":"2026-08-18","event":"Conventional-island and BOP installation works officially launched alongside unit 5","source":"https://en.cinie.net/article/61285.html"}],"sources":["https://world-nuclear.org/nuclear-reactor-database/summary/report?report=gen&status=Under%20Construction","https://pris.iaea.org/pris/","https://en.cinie.net/article/61285.html"],"last_verified":"2026-09-28","verified":true,"confidence":"medium","notes":"Nuclear-island FCD Dec 2025 per CINIE (consistent with the recorded construction start 2025). Sep-2026 media tour: unit 5 in equipment installation, unit 6 in main-works construction.","tags":["cn","hualong"],"updated_at":"2026-09-28","slippage_years":null}}