{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"taipingling-6","name":"Taipingling-6","plant":"Taipingling","unit":6,"country":"CN","region":"asia","reactor_type":"PWR","design":"Hualong One 2.0","capacity_mw_net":1126,"is_smr":false,"vendor":"CGN","owner_operator":"CGN","vendor_id":"org:cgn","owner_operator_ids":["org:cgn"],"design_id":"design:hualong-one","site_id":"site:taipingling","status":"planned","construction_start":null,"original_cod_target":null,"current_cod_estimate":null,"milestones":[{"date":"2026-07-31","event":"State Council approved Taipingling Phase III units 5 and 6 as Hualong One 2.0 demonstration projects","source":"https://www.cgnpc.com.cn/cgn/c100944/2026-08/03/content_349a80b88b574b42ba6183c30a11e52b.shtml"}],"sources":["https://www.cgnpc.com.cn/cgn/c100944/2026-08/03/content_349a80b88b574b42ba6183c30a11e52b.shtml","https://english.www.gov.cn/news/202607/31/content_WS6a6ca61cc6d00ca5f9a0c83a.html","https://www.world-nuclear-news.org/articles/china-approves-construction-of-eight-more-reactors"],"last_verified":"2026-10-27","verified":true,"confidence":"high","notes":"CGN primary release identifies Guangdong Taipingling Phase III as a two-unit Hualong One 2.0 demonstration project; State Council report confirms approval of four projects and WNN identifies units 5/6. 1126 MWe is provisional design-typical net capacity (as used for Jinqimen-3), not the reported 1217 MWe rating; unit-specific net capacity and COD unconfirmed. No nuclear-island first concrete reported.","tags":["cn","hualong"],"updated_at":"2026-10-27","slippage_years":null}}