{"docs":"https://www.nuclearnewsnetwork.com/tracker","terms":"History surfaces — append-only milestone logs, event/change feeds, and full JSON snapshots — are provided under the NNN Data License Terms (https://www.nuclearnewsnetwork.com/data-license): journalism, research, citation and AI answering are expressly permitted royalty-free with attribution; systematic bulk extraction, dataset redistribution, and embedding in commercial products or training corpora require a commercial license.","terms_url":"https://www.nuclearnewsnetwork.com/data-license","attribution":{"text":"Nuclear News Network, \"NNN Reactor Project Tracker\", https://www.nuclearnewsnetwork.com/tracker","url":"https://www.nuclearnewsnetwork.com/tracker"},"unit":{"slug":"xudabao-2","name":"Xudabao-2","plant":"Xudabao","unit":2,"country":"CN","region":"asia","reactor_type":"PWR","design":"CAP1000","capacity_mw_net":1150,"is_smr":false,"vendor":"SPIC (CAP1000)","owner_operator":"CNNC & Datang","status":"under_construction","construction_start":"2024-07","original_cod_target":null,"current_cod_estimate":2029,"milestones":[{"date":"2026-06-16","event":"Listed as under construction in the WNA world table, grid connection estimated 2029","source":"https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide"}],"sources":["https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide","https://pris.iaea.org/pris/"],"last_verified":"2026-08-09","verified":true,"confidence":"medium","notes":"Verified 2026-08-09 against the current WNA reactor table, IAEA PRIS, and corroborating Chinese construction reporting.","tags":["cn","cap1000"],"updated_at":"2026-08-09","slippage_years":null}}