Role in Prometheus
Not yet publicly detailed.
Commitments
| Tier | Consortium member |
| Category | Reactor developer |
| Board seat | — |
| Capital committed | — |
| In-kind | — |
| Ticker | — |
Notes
2026-09-24 verification: no second-source Prometheus role description found; the July X statement remains a lead only, so role remains null and confidence low. INL confirms consortium membership. Apollo Atomics (YC P26, MIT spinoff) is developing ultra-compact truck-transportable PWRs (>80 MW, ~40x smaller footprint, <24-month deployment target) and raised a $31M seed led by FCVC announced 2026-08-20 (PR Newswire, corroborated by TechCrunch and Pulse 2.0; >20 GW of signed LOIs reported). Its 2026-07-25 X post is the only public statement of its Prometheus role — X-only, so per tracker policy the role field stays null until a second source appears; tracked as a lead.
Milestone log
- 2026-07-25 — Company announced on X that it is joining the AI for Nuclear Energy Consortium (Prometheus, INL-led, DOE Genesis Mission), framing its contribution as bringing AI into design, licensing, manufacturing, and operation of next-generation nuclear systems — X-only statement, not yet corroborated by a second source (source)