Xiapu-1 (CFR-600)

CFR-600 · 560 MWe · Under construction · commercial operation est. 2026

Seeded record — the verification pass (two independent sources) has not yet confirmed every field. Treat estimates as provisional.

Current state

StatusUnder construction
DesignCFR-600 (SFR)
Net capacity560 MWe
CountryChina
VendorCNNC
Owner / operatorCNNC
Construction start2017-12-29
Original COD target
Current COD estimate2026
Schedule slippage

Notes

China's sodium-cooled fast reactor demonstration unit. Bulk-seeded 2026-07-13 from the WNA under-construction table (updated 2026-06-16). Capacity is design-typical net output; construction dates are provisional. Verification agent to confirm against IAEA PRIS and append milestones.

Milestone log

  • 2017-12-29Construction start (first concrete) (source)
  • 2026-06-16Listed as under construction in the WNA world table, grid connection estimated 2026 (source)

The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.