Current state
| Status | Under construction |
| Design | CFR-600 (SFR) |
| Net capacity | 560 MWe |
| Country | China |
| Vendor | CNNC |
| Owner / operator | CNNC |
| Construction start | 2020 |
| Original COD target | — |
| Current COD estimate | 2027 |
| Schedule slippage | — |
Notes
No fresh 2026 reporting found — CNNC opaque on CFR-600 unit 2 (sister unit Xiapu-1 reportedly operating since 2023, unconfirmed in open sources). construction start 2020-12-27 per WNN Dec 2020, corroborated by Wikipedia citing IAEA PRIS Feb 2026; confirm via PRIS direct. original COD target needs PRIS; 2026 grid expectation from 2020 reporting is stale, not asserted.
Milestone log
- 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2027 (source)
The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.