Nuclear Decommissioning Tracker

Humboldt Bay Power Plant Unit 3

License terminated · United States · Deferred (SAFSTOR)

PG&E's 65 MWe Humboldt Bay Unit 3 BWR last operated in 1976 and was fully decommissioned between 2016 and 2021 under an NRC-approved license termination plan. The NRC terminated the reactor license in November 2021; spent fuel remains in an on-site ISFSI under a separate license.

New to decommissioning? The nuclear decommissioning market in 2026: size, players, pipeline

Current state

StatusLicense terminated
CountryUnited States
LocationEureka, California
SiteHumboldt Bay Power Plant
UnitsUnit 3
Unit count1
Reactor typesBWR
Owner / licenseePacific Gas and Electric Company
StrategyDeferred (SAFSTOR)
Final shutdown1976
Decommissioning start2016-05
Target completion2021
Spent fuelAbout 390 spent fuel assemblies in the on-site ISFSI (separately licensed).

Notes

65 MWe gross/electric per Federal Register notice; net figure not given so capacity not recorded.

Timeline

  • 1976 — Humboldt Bay Unit 3 last operated. (source)
  • 1984 — The reactor was permanently defueled. (source)
  • 2016-05-04 — NRC approved the License Termination Plan. (source)
  • 2021-11-18 — NRC terminated Facility Operating License DPR-7. (source)

The timeline is append-only: corrections are added as new entries. Stated targets appear in the current-state table, never as milestones.

Related sites

See all 72 sites in the Nuclear Decommissioning Tracker →

Sources

  1. Pacific Gas and Electric Co.; Humboldt Bay Power Plant, Unit 3; License termination — Federal Register / NRC (primary), checked 2026-10-11
  2. NRC removes monitoring requirements for Humboldt Bay ISFSI after decom — ExchangeMonitor, checked 2026-10-11