PG&E's 65 MWe Humboldt Bay Unit 3 BWR last operated in 1976 and was fully decommissioned between 2016 and 2021 under an NRC-approved license termination plan. The NRC terminated the reactor license in November 2021; spent fuel remains in an on-site ISFSI under a separate license.
New to decommissioning? The nuclear decommissioning market in 2026: size, players, pipeline
Current state
| Status | License terminated |
| Country | United States |
| Location | Eureka, California |
| Site | Humboldt Bay Power Plant |
| Units | Unit 3 |
| Unit count | 1 |
| Reactor types | BWR |
| Owner / licensee | Pacific Gas and Electric Company |
| Strategy | Deferred (SAFSTOR) |
| Final shutdown | 1976 |
| Decommissioning start | 2016-05 |
| Target completion | 2021 |
| Spent fuel | About 390 spent fuel assemblies in the on-site ISFSI (separately licensed). |
Notes
65 MWe gross/electric per Federal Register notice; net figure not given so capacity not recorded.
Timeline
- 1976 — Humboldt Bay Unit 3 last operated. (source)
- 1984 — The reactor was permanently defueled. (source)
- 2016-05-04 — NRC approved the License Termination Plan. (source)
- 2021-11-18 — NRC terminated Facility Operating License DPR-7. (source)
The timeline is append-only: corrections are added as new entries. Stated targets appear in the current-state table, never as milestones.
Related sites
- Barsebäck Nuclear Power Plant Active dismantling · Sweden
- Berkeley (Magnox) SAFSTOR · United Kingdom
- Bradwell (Magnox) SAFSTOR · United Kingdom
- Crystal River Unit 3 Site restoration · United States
- Dresden Unit 1 SAFSTOR · United States
- Duane Arnold Energy Center Restart planned · United States
- Dungeness B Fuel removal · United Kingdom
- Fermi Unit 1 (Enrico Fermi Atomic Power Plant) SAFSTOR · United States
See all 72 sites in the Nuclear Decommissioning Tracker →
Sources
- Pacific Gas and Electric Co.; Humboldt Bay Power Plant, Unit 3; License termination — Federal Register / NRC (primary), checked 2026-10-11
- NRC removes monitoring requirements for Humboldt Bay ISFSI after decom — ExchangeMonitor, checked 2026-10-11