International edition
Nuclear News Network

Reporting the buildout, from mine to megawatt

Nuclear Decommissioning Tracker

Crystal River Unit 3

Site restoration · United States · Immediate dismantling

Crystal River 3, retired after its containment cracked during a 2009 steam generator replacement, is being decommissioned by ADP (NorthStar/Orano JV) under a fixed-price deal while Duke Energy keeps ownership and the trust fund. Reactor building demolition was due by end-August 2026, with site restoration in Q2 2027 and an NRC license termination plan under review.

New to decommissioning? The nuclear decommissioning market in 2026: size, players, pipeline

Current state

StatusSite restoration
CountryUnited States
LocationCrystal River, Florida
SiteCrystal River Energy Complex
UnitsUnit 3
Unit count1
Reactor typesPWR
Net capacity (MWe)860
Owner / licenseeDuke Energy Florida (licensed operator: ADP CR3 LLC)
Decommissioning contractorAccelerated Decommissioning Partners (NorthStar/Orano)
StrategyImmediate dismantling
Final shutdown2013-02-20
Decommissioning start2020-10-01
Target completion2027
Cost estimateUSD 540m (as of 2019)
Spent fuelAll fuel in the on-site ISFSI since January 2018.
Notable issueContainment delamination during the 2009 steam generator replacement led to early retirement.

Notes

Cost = fixed-price ADP contract ($540m) per WNA (page updated 2026-03); WNA also cites trust funds >$700m without date. NRC lists estimated closure 2037 (likely includes ISFSI); ADP targets site restoration Q2 2027 and final surveys Q3 2027.

Timeline

  • 2009-09-26 — A refueling outage began during which containment damage was found after the steam generator replacement. (source)
  • 2013-02-20 — The operating license period ended as Duke retired the unit. (source)
  • 2018-01 — Fuel transfer to the ISFSI was completed. (source)
  • 2020-10-01 — Duke transferred the license to Accelerated Decommissioning Partners. (source)
  • 2025-10-15 — ADP submitted the license termination plan amendment request to the NRC. (source)
  • 2026-05-12 — NRC held a public meeting on the LTP; ADP said reactor building demolition would finish by end-August 2026. (source)

The timeline is append-only: corrections are added as new entries. Stated targets appear in the current-state table, never as milestones.

Related sites

See all 72 sites in the Nuclear Decommissioning Tracker →

Sources

  1. Crystal River Unit 3 Nuclear Generating Plant — U.S. NRC (primary), checked 2026-10-11
  2. ADP on track to complete major D&D work at Crystal River-3 this summer — ANS Nuclear Newswire, checked 2026-10-11
  3. Decommissioning Nuclear Facilities — World Nuclear Association, checked 2026-10-11
  4. Locations of Power Reactor Sites Undergoing Decommissioning — U.S. NRC (primary), checked 2026-10-11