Nuclear Plant Restarts Tracker

Genkai Unit 3

Restarted · Japan · Post-Fukushima restart

Genkai 3 is a 1,127 MWe (net) Kyushu Electric PWR licensed for MOX fuel that restarted in March 2018 after more than seven years offline. It is in operation; a periodic inspection that began in June 2026 is scheduled to end with commercial operation in November 2026.

Background: Palisades fuel loading: Holtec restart timeline and what comes next · NRC reactor licensing process, explained

Current state

StatusRestarted
CountryJapan
LocationGenkai, Saga Prefecture
PlantGenkai
Unit3
OperatorKyushu Electric Power
Reactor typePWR
Net capacity (MWe)1,127
Restart typePost-Fukushima restart
Shut down2010-12-11
Restarted2018-03-23
Years offline7.3
RegulatorNRA conformity approval 2017-01-18 (MOX use assumed)
Local consentSaga governor approved restart of units 3 and 4 in April 2017

Notes

Per WNN, power generation resumed 2018-04-18 (later than the 25 March plan). JAIF gross output 1,180 MWe; net from WNA. Unit was also briefly offline in late 2022 over the specialised safety facility deadline (WNA).

Timeline

  • 2010-12-11 — Genkai 3 entered an outage that lasted through the Fukushima accident. (source)
  • 2013-07-12 — Kyushu applied for the NRA conformity review. (source)
  • 2017-01-18 — The NRA officially approved Genkai 3 and 4. (source)
  • 2018-03-23 — Kyushu began the restart of Genkai 3 by withdrawing control rods. (source)
  • 2018-05-16 — Genkai 3 returned to commercial operation. (source)
  • 2026-06-30 — Genkai 3 was shut down for a periodic inspection. (source)

The timeline is append-only: corrections are added as new entries. Stated targets appear in the current-state table, never as milestones.

Related units

See all 45 units in the Nuclear Plant Restarts Tracker →

Sources

  1. Current Status of Nuclear Power Plants in Japan as of August 7, 2026 — Japan Atomic Industrial Forum (JAIF) (primary), checked 2026-10-11
  2. Current Status of Nuclear Power Plants in Japan as of March 14, 2019 — Japan Atomic Industrial Forum (JAIF) (primary), checked 2026-10-11
  3. Nuclear Power in Japan — World Nuclear Association, checked 2026-10-11
  4. Seventh Japanese reactor restarted — World Nuclear News, checked 2026-10-11
  5. Genkai unit 4 supplying power again — World Nuclear News, checked 2026-10-11