Reactor TrackerChina

San'ao-3 (Cangnan)

Hualong One · 1,090 MWe · Under construction · commercial operation est. 2030

Current state

StatusUnder construction
DesignHualong One (PWR)
Net capacity1,090 MWe
CountryChina
VendorCGN
Owner / operatorCGN
Construction start2025-11-18
Original COD target—
Current COD estimate2030
Schedule slippage—

Notes

Phase 2 (units 3&4) approved by China's State Council in August 2024. First concrete 2025-11-18 per WNN and NEI (NNSA permit 2025-11-13). Six Hualong One units planned; San'ao is CGN-led (Zhejiang Cangnan Nuclear Power; Geely holds 2%). COD 2030 per WNA table.

Milestone log

  • 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2030 (source)
  • 2025-11-13 — China's NNSA issued construction permits for San'ao units 3 and 4 after on-site inspection of nuclear island preparations (source)
  • 2025-11-18 — First concrete poured for the nuclear island of unit 3 (~8,820 cubic metre pour), marking official start of construction (source)

The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.

NNN coverage

On the Hualong One (HPR1000) design

Sources

  1. https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide
  2. https://pris.iaea.org/pris/
  3. https://world-nuclear-news.org/articles/third-sanao-unit-under-construction
  4. https://www.neimagazine.com/news/first-concrete-for-sanao-3/