Hualong One · 1,126 MWe · Under construction · commercial operation est. 2029

Current state

StatusUnder construction
DesignHualong One (PWR)
Net capacity1,126 MWe
CountryChina
VendorCNNC
Owner / operatorCNNC & Guodian
Construction start2024
Original COD target—
Current COD estimate2029
Schedule slippage—

Notes

Verified 2026-09-22: steam generators installed January 2026 and inner containment dome February 2026 per NucNet/CNEA. Construction began February 2024; sister unit Zhangzhou-2 entered commercial operation 2026-01-05. Grid connection 2029 per WNA table.

Milestone log

  • 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2029 (source)
  • 2026-01-28 — All steam generators installed at Zhangzhou-3 (source)
  • 2026-02-06 — Inner steel containment dome lifted into place at Zhangzhou-3 (source)

The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.

NNN coverage

On the Hualong One (HPR1000) design

Sources

  1. https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide
  2. https://pris.iaea.org/pris/
  3. https://www.nucnet.org/news/inner-steel-dome-lifted-into-place-at-china-s-zhangzhou-3-nuclear-plant-2-5-2026
  4. https://www.nucnet.org/news/all-steam-generators-installed-at-china-s-zhangzhou-3-nuclear-power-plant-1-3-2026