Nuclear Plant Restarts Tracker

Ohi Unit 4

Restarted · Japan · Post-Fukushima restart

Ohi 4 is a 1,127 MWe (net) Kansai Electric PWR. After running in 2012-2013 it was the last Japanese reactor operating when it shut on 15 September 2013, and it restarted under the new NRA rules in May 2018; it is operating.

Background: Palisades fuel loading: Holtec restart timeline and what comes next · NRC reactor licensing process, explained

Current state

StatusRestarted
CountryJapan
LocationOhi, Fukui Prefecture
PlantOhi
Unit4
OperatorKansai Electric Power
Reactor typePWR
Net capacity (MWe)1,127
Restart typePost-Fukushima restart
Shut down2013-09-15
Restarted2018-05-09
Years offline4.6
RegulatorNRA conformity approval 2017-05-24
Local consentFukui governor approved restart of units 3 and 4 in November 2017

Notes

shut down is the September 2013 shutdown after the 2012 interim restart. Local consent per WNN's Ohi 3 article (Nov 2017).

Timeline

  • 2013-09-15 — Ohi 4 entered a periodic outage inspection, leaving Japan with no operating reactors. (source)
  • 2017-05-24 — The NRA officially approved Ohi 3 and 4. (source)
  • 2018-05-09 — Kansai restarted Ohi 4. (source)
  • 2018-06-05 — The unit resumed commercial operation. (source)
  • 2026-06-22 — Ohi 4 restarted commercial operation after a periodic inspection. (source)

The timeline is append-only: corrections are added as new entries. Stated targets appear in the current-state table, never as milestones.

Related units

See all 45 units in the Nuclear Plant Restarts Tracker →

Sources

  1. Current Status of Nuclear Power Plants in Japan as of August 7, 2026 — Japan Atomic Industrial Forum (JAIF) (primary), checked 2026-10-11
  2. Nuclear Power in Japan — World Nuclear Association, checked 2026-10-11
  3. Schedule of Ohi Unit No. 4 Reactor Startup and Power Control Operation — Kansai Electric Power (primary), checked 2026-10-11
  4. Japan's Ohi 4 restarts — Nuclear Engineering International, checked 2026-10-11
  5. Ohi 3 reaches critical milestone in restart — World Nuclear News, checked 2026-10-11