El Dabaa-4

VVER-1200 · 1,110 MWe · Under construction · commercial operation est. 2030

Current state

StatusUnder construction
DesignVVER-1200 (PWR)
Net capacity1,110 MWe
CountryEgypt
VendorRosatom
Owner / operatorNPPA
Construction start2024-01-23
Original COD target—
Current COD estimate2030
Schedule slippage—

Notes

First concrete 2024-01-23 per PRIS. WNN (2026-07-09) confirms accelerated site pace; unit 2 RPV installed 2026-07-09 and unit 4 RPV manufacturing started ahead of that ceremony. COD 2030 consistent with WNA table; Rosatom cites grid connections from 2028 for the plant. Plant-level Sep 2026: ministerial fuel-delivery review (fuel 2027), KHNP turbine-hall review, 6-unit expansion study — see el-dabaa-1 notes.

Milestone log

  • 2024-01-23 — Construction start (first concrete) (source)
  • 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2030 (source)
  • 2026-07-09 — Rosatom reported its manufacturing division had begun producing the reactor pressure vessel for El Dabaa unit 4 at Atommash, announced alongside the unit 2 RPV installation ceremony; site targets first fuel in H1 2027 and grid connection of the plant's units from 2028 (source)

The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.

NNN coverage

On the VVER-1200 design

Sources

  1. https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide
  2. https://pris.iaea.org/pris/
  3. https://rosatomnewsletter.com/2026/08/31/%D0%BD%D0%BE%D0%B2%D0%BE%D1%81%D1%82%D0%B8-%D0%B0%D1%8D%D1%81-%D1%8D%D0%BB%D1%8C-%D0%B4%D0%B0%D0%B1%D0%B0%D0%B0/
  4. https://www.world-nuclear-news.org/articles/reactor-vessel-installed-in-el-dabaas-second-unit