Reactor TrackerRussia

Leningrad II-4

VVER-1200 · 1,110 MWe · Under construction · commercial operation est. 2030

Current state

StatusUnder construction
DesignVVER-1200 (PWR)
Net capacity1,110 MWe
CountryRussia
VendorRosatom
Owner / operatorRosenergoatom
Construction start2025-03
Original COD target—
Current COD estimate2030
Schedule slippage—

Notes

Construction start Mar 2025 per Rosatom via NucNet (operator-origin; recorded as medium). General contractor Titan-2. Rosenergoatom chief Jul 2026: 55 workfronts, on/ahead of schedule; replacement units commissioning 2030 (unit 3) and 2032 (unit 4) — tracker CODs 2029/2030 retained pending WNA revision.

Milestone log

  • 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2030 (source)
  • 2026-06-19 — Concrete pouring began for reactor shaft (source)
  • 2026-08-05 — 157-t core-catcher body installed three months ahead of schedule (Titan-2); first large equipment installation at unit 4 (source)
  • 2026-08-12 — First 97-t tier of the inner containment shell installed ahead of schedule; RPV installation scheduled H2 2029 (source)

The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.

NNN coverage

On the VVER-1200 design

Sources

  1. https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide
  2. https://pris.iaea.org/pris/
  3. https://www.world-nuclear-news.org/articles/concrete-poured-for-reactor-shaft-at-leningrads-eighth-unit
  4. https://www.nucnet.org/news/russia-announces-construction-progress-at-leningrad-2-4-nuclear-plant-8-5-2026
  5. https://www.neimagazine.com/news/leningrad-8-containment-rises/