La Crosse Boiling Water Reactor (LACBWR)

License terminated · United States · Mixed

The small LACBWR demonstration BWR, shut since 1987, was dismantled by EnergySolutions' LaCrosseSolutions after a 2016 license transfer. The NRC approved license termination for the reactor site in February 2023 and returned the remaining ISFSI-only license to owner Dairyland Power in March 2023.

New to decommissioning? The nuclear decommissioning market in 2026: size, players, pipeline

Current state

StatusLicense terminated
CountryUnited States
LocationGenoa, Wisconsin
SiteGenoa Site
UnitsLACBWR
Unit count1
Reactor typesBWR
Owner / licenseeDairyland Power Cooperative
Decommissioning contractorLaCrosseSolutions (EnergySolutions)
StrategyMixed
Final shutdown1987
Decommissioning start2016
Target completion2023
Spent fuelAll fuel transferred to an on-site ISFSI in September 2012.

Notes

Strategy "Mixed": long SAFSTOR then DECON.

Timeline

  • 1987 — LACBWR shut down permanently. (source)
  • 2012-09 — Transfer of used fuel to the on-site ISFSI was completed. (source)
  • 2016 — The license was transferred from Dairyland to LaCrosseSolutions to complete decommissioning. (source)
  • 2023-02-24 — NRC issued its safety evaluation approving license termination (except the ISFSI) and the license transfer. (source)
  • 2023-03-15 — NRC formally transferred the ISFSI-only license back to Dairyland. (source)

The timeline is append-only: corrections are added as new entries. Stated targets appear in the current-state table, never as milestones.

NNN coverage

About EnergySolutions

Related sites

See all 72 sites in the Nuclear Decommissioning Tracker →

Sources

  1. LACBWR Decommissioning Project — Dairyland Power Cooperative (primary), checked 2026-10-11
  2. NRC Approves License Termination and Site Release for LACBWR — EnergySolutions (primary), checked 2026-10-11
  3. La Crosse Boiling Water Reactor - Decommissioning Funding Status — U.S. NRC (licensee filing) (primary), checked 2026-10-11