Reactor TrackerEgypt

El Dabaa-2

VVER-1200 · 1,110 MWe · Under construction · commercial operation est. 2030

Current state

StatusUnder construction
DesignVVER-1200 (PWR)
Net capacity1,110 MWe
CountryEgypt
VendorRosatom
Owner / operatorNPPA
Construction start2022-11-19
Original COD target—
Current COD estimate2030
Schedule slippage—

Notes

Unit-2 RPV installed 2026-07-09 (WNN; corroborated by Rosatom newsletter coverage of the installation ceremony). Plant-level Sep 2026: ministerial fuel-delivery review (fuel 2027), KHNP turbine-hall progress review, 6-unit expansion study — see el-dabaa-1 notes.

Milestone log

  • 2022-11-19 — Construction start (first concrete) (source)
  • 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2030 (source)
  • 2026-07-09 — 330-t reactor pressure vessel installed at unit 2 (7 months after unit 1's vessel) (source)

The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.

NNN coverage

On the VVER-1200 design

Sources

  1. https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide
  2. https://pris.iaea.org/pris/
  3. https://www.world-nuclear-news.org/articles/reactor-vessel-installed-in-el-dabaas-second-unit