Reactor TrackerEgypt

El Dabaa-3

VVER-1200 · 1,110 MWe · Under construction · commercial operation est. 2030

Current state

StatusUnder construction
DesignVVER-1200 (PWR)
Net capacity1,110 MWe
CountryEgypt
VendorRosatom
Owner / operatorNPPA
Construction start2023-05-03
Original COD target—
Current COD estimate2030
Schedule slippage—

Notes

RPV installation for unit 3 is next (vessel 13 m, 320 t). Plant-level Sep 2026: ministerial fuel-delivery review (fuel 2027), KHNP turbine-hall progress review, 6-unit expansion study — see el-dabaa-1 notes.

Milestone log

  • 2023-05-03 — Construction start (first concrete) (source)
  • 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2030 (source)
  • 2026-08-28 — Dry shielding installed in the unit-3 reactor pit (NPPA) (source)
  • 2026-09-26 — Reactor-pit lower plate (13.85 t) installed at unit 3, final prep step before the 320-t RPV installation (NPPA) (source)

The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.

NNN coverage

On the VVER-1200 design

Sources

  1. https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide
  2. https://pris.iaea.org/pris/
  3. https://english.ahram.org.eg/NewsContentP/1/577571/Egypt/Egypt-installs-lower-plate-at-third-reactor-unit-o.aspx