Current state
| Type | Subsequent licence renewal |
| Outcome | Issued |
| Applicant | NextEra Energy Point Beach, LLC |
| Facility | Point Beach Nuclear Plant (Point Beach 1, Point Beach 2) |
| Docket | 50-266, 50-301 |
| Submitted | 2020-11-16 |
| Docketed (accepted for review) | 2021-01-15 |
| NRC planned schedule | — |
| NRC target date | — |
| Final safety evaluation | 2022-02-23 |
| Decision | 2025-09-29 |
| Review time (docketed → decision) | 56.4 mo |
| Submitted → decision | 58.4 mo |
| NRC-reported review duration | — |
| NRC-reported resources vs estimate | — |
Review time is measured in average months from the date the NRC docketed the application to the decision. The NRC's own reported durations may measure to the final safety evaluation instead.
Notes
Affected by Feb 2022 GEIS orders (safety review done Feb 2022). NRC News Release 25-058 also cites 'a supplement to its May 2022 safety evaluation' issued in August 2025. Whether the 12/2025 -> 09/2025 target change was tied to EO 14300 is not stated in any fetched source (eo_14300_related left null). NRC decision target: originally 2022-07, latest 2025-09. Schedule: Original 07/2022; 'TBD*' after the Feb 2022 GEIS orders; archived page (last updated April 25, 2025) showed 12/2025; current page shows 09/2025; actual 09/29/2025. The fetched sources do not say why the target moved from 12/2025 to 09/2025.
Timeline
- 2020-11-16 — Application submitted. (source)
- 2021-01-15 — NRC letter: acceptable for docketing. (source)
- 2021-01-22 — FR notice of acceptance and opportunity to request a hearing (86 FR 6684). (source)
- 2021-03-23 — Hearing request by Physicians for Social Responsibility Wisconsin (ASLB established 2021-04-02). (source)
- 2022-02-23 — Safety evaluation issued (Rev. 1 2022-05-25). (source)
- 2022-02-23 — Final safety evaluation issued. (source)
- 2022-02-24 — Commission GEIS orders affect review. (source)
- 2024-10-02 — FR notice of intent to prepare supplement to draft SEIS. (source)
- 2025-04-16 — Second draft SEIS noticed. (source)
- 2025-08-08 — Final SEIS issued. (source)
- 2025-09-29 — Subsequent renewed licenses DPR-24 and DPR-27 issued. (source)
- 2025-09-29 — Issued. (source)
The timeline is append-only: corrections are added as new entries. See the NNN Data License Terms for reuse of the event history.
NNN coverage
About NextEra Energy
Related reviews
- R.E. Ginna Nuclear Power Plant – Subsequent License Renewal Under review · —
- Cooper Nuclear Station – Subsequent License Renewal Under review · —
- Nine Mile Point Nuclear Station Unit 1 – Subsequent License Renewal Under review · —
- Edwin I. Hatch Nuclear Plant Units 1 and 2 – Subsequent License Renewal Issued · 11.9 mo
- H.B. Robinson Steam Electric Plant Unit 2 – Subsequent License Renewal Issued · 11.8 mo
- Dresden Nuclear Power Station Units 2 and 3 – Subsequent License Renewal Issued · 18.1 mo
- Browns Ferry Nuclear Plant Units 1, 2 and 3 – Subsequent License Renewal Issued · 20.7 mo
- Virgil C. Summer Nuclear Station Unit 1 – Subsequent License Renewal Issued · 20.5 mo
See all 75 reviews in the NRC Licensing Review Tracker →
Sources
- https://www.nrc.gov/licensing-applications/power-reactor-licensing/point-beach-nuclear-plant-units-1-2-subsequent-license-renewal-application
- https://www.federalregister.gov/documents/2020/12/29/2020-28626
- https://www.federalregister.gov/documents/2021/01/22/2021-01410
- https://www.federalregister.gov/documents/2021/04/02/2021-06785
- https://www.federalregister.gov/documents/2025/10/01/2025-19194
- https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2025/25-058.pdf
- https://web.archive.org/web/20210614/https://www.nrc.gov/reactors/operating/licensing/renewal/applications/point-beach-subsequent.html
- https://web.archive.org/web/20250515/https://www.nrc.gov/reactors/operating/licensing/renewal/applications/point-beach-subsequent.html
- https://www.nrc.gov/licensing-applications/operating-reactor-licensing/reactor-license-renewal/status-subsequent-license-renewal-applications