Current state
| Status | Under construction |
| Design | CAP1000 (PWR) |
| Net capacity | 1,150 MWe |
| Country | China |
| Vendor | SPIC (CAP1000) |
| Owner / operator | SPIC |
| Construction start | 2022 |
| Original COD target | — |
| Current COD estimate | 2027 |
| Schedule slippage | — |
Notes
Verified 2026-08-09 against the current WNA reactor table, IAEA PRIS, and corroborating Chinese construction reporting.
Milestone log
- 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2027 (source)
The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.