Tianwan-8

VVER-1200 · 1,110 MWe · Under construction · commercial operation est. 2027

Current state

StatusUnder construction
DesignVVER-1200 (PWR)
Net capacity1,110 MWe
CountryChina
VendorRosatom
Owner / operatorCNNC (JNPC)
Construction start2022
Original COD target—
Current COD estimate2027
Schedule slippage—

Notes

Verified 2026-09-28: RPV installed September 2024 per WNN/CNNC/Rosatom; cold tests Aug 2026 (WNN/CNNC, covered by NNN newsroom Aug 10). Sister unit Tianwan-7 in fuel loading (Aug 2026, date conflict noted on unit-7 file); unit 8 grid connection 2027 per WNA table.

Milestone log

  • 2026-06-16 — Listed as under construction in the WNA world table, grid connection estimated 2027 (source)
  • 2024-09-02 — Reactor pressure vessel (332 t) installed at Tianwan-8 (source)
  • 2026-08-05 — Cold functional tests completed (CNNC via WNN); unit moves from installation into commissioning (source)

The milestone log is append-only: corrections are recorded as new entries, never rewrites. Full history via /api/v1/changes.

NNN coverage

About Tianwan-8

On the VVER-1200 design

Sources

  1. https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide
  2. https://pris.iaea.org/pris/
  3. https://www.world-nuclear-news.org/articles/reactor-vessel-installed-at-tianwan-8
  4. https://www.world-nuclear-news.org/articles/tianwan-8-completes-cold-functional-tests